How long does it take to remodel a kitchen?
Any kitchen remodelling project takes time, but there’s no set time frame for completing one. Several factors such as the size of your kitchen, the extent of the work required, and the availability of materials and labour will impact, one way or another, how long it takes to finish your kitchen remodel.
To have a much clearer idea, we’ve compiled information that details all the steps comprising the project. Doing so will help you better value the time, effort, and cost needed to achieve the kitchen of your dreams.
Initial Consultation and Design
The one thing you ought to do is schedule an initial consultation with a kitchen designer or contractor. This usually takes about 1-2 hours. During this meeting, you’ll discuss your vision for the space, go over the work that needs to be done, and talk about potential layout options.
Afterward, the designer will create a preliminary design for your new kitchen. This will be used to create a more accurate estimate of the costs involved in the remodelling project. Once you’ve approved the design, the contractor can then proceed with obtaining the necessary permits and ordering materials.
Obtaining Permits
The time allotted to obtain the required permits for your kitchen remodel will depend on your municipality’s permitting process. In some cases, it could take a few weeks while in others, it may only take a couple of days.
To speed up the process, see to it that you have all the required documents ready before submitting your application. These typically include floor plans, elevations, and specifications of the work to be done.
Ordering Materials
Once the permits have been secured, the contractor can proceed with ordering the materials needed for the remodel. The time needed to receive all the materials will depend on their availability. For example, if you’re using custom or made-to-order items, it will obviously take longer to receive them than if you’re using standard materials that are readily available.
Construction Work
The actual construction work is usually the most time-consuming part of the kitchen remodelling process. The duration will again depend on the scope of the project. For example, a complete gut job will obviously take longer to finish than a partial remodel.
As a general guideline, a small kitchen remodels that only involves replacing cabinets and countertops can be completed in about 2-4 weeks. A medium-sized remodel that also includes installing new appliances and flooring can take 4-8 weeks. And a large-scale remodel that involves reconfiguring the layout of the space can take 8 weeks or longer.
Final Touches
Once the construction work is finished, there are still a few things that need to be done before the kitchen is completely ready for use. These final touches include painting, installing hardware and fixtures, and hooking up appliances and plumbing. Depending on the size of the kitchen and the extent of the work required, this can take another 1-2 weeks.
As you can see, there’s no straightforward answer to the question, “How long does it take to remodel a kitchen?” The duration of the project will ultimately depend on several factors, including the size of the kitchen, the extent of the work required, and the availability of materials and labour.
With that said, it’s generally safe to assume that a small kitchen remodel can be completed in about 4-6 weeks while a larger remodel can take 8 weeks or longer. Of course, there’s always the possibility of delays due to unforeseen circumstances but, in general, this is how long it’ll take to remodel a kitchen.